Progress Report

Progress Report of UKHPP Jan 2023

The Upper Khudi Hydropower Project is a snow fed perennial Run of River (ROR) project.



Khudi Hydropower Project 26 MW


The Upper Khudi Hydropower Project is a run of river type project. It is a high head project with 4.69 m3/s design discharge, 531.86 m gross head and 26 MW installed capacity. It generates 129.19 GWh energy annually. It is located at the upstream of existing Khudi Hydropower Project (4.0 MW) in Marsyangdi Rural Municipality of Lamjung district. The project area lies at about 14 km from Besisahar, the district headquarter of Lamjung, and 188 km from Kathmandu. Geographically the project area lies within 84018’32”E / 84019’26”E to 84020’44”E and 28018’22”N to 28021’19”N/ 28021’50”N. The project is owned by Super Khudi Hydropower Pvt. Ltd.

  • District: Lamjung
  • Plant Factor : 83.36 %
  • Gross Head : 531.86 m
  • Installed Capacity : 26 MW
  • Net Annual Generation : 139.22 GWh


Recent Notice

Awesome Image

Hydro Review is the trusted voice connecting the global hydro energy market.

Awesome Image

Hydro Review is the trusted voice connecting the global hydro energy market.

Awesome Image

Hydro Review is the trusted voice connecting the global hydro energy market.

Awesome Image

Hydro Review is the trusted voice connecting the global hydro energy market.

We Make Your Dream Carefully.

The Upper Khudi Hydropower Project is a run of river type project.

Construction Video

Location & Boundary of Khudi Hydropower Project 26 MW ?

Development Region: Western; District:Lamjung; Nearest town:Beshisahar; East:84020’44”; West:28021’19” to 28021’50” North:84018’32” to 84019’26” South: 28018’22”

Purpose of Khudi Hydropower Project 26 MW ?

Hydrology of Khudi Hydropower Project 26 MW ?

Catchment Area: 72.3 sq km;Average Precipitation: 5,176 mm;100 years Flood Discharge: 182 m3/s;Average Flow: 6.13 m3/s;Design Flow: 6.15 m3/s;Minimum Dry Season Flow: 2.092 m3/s.

Settling Basin of Khudi Hydropower Project 26 MW?

Type : Underground;No of Units: 2; Size: 84 m x 4.25 m;Normal Flow Depth: 5.38 m ;Inlet Transition Length : 17 m;Outlet Transition Length: 10.20 m; Settling Criteria: 90% of >0.15 mm at 15oc.

latest News

Awesome Image
25

Jan

  • Thu, Jan 25, 2024 on Latest, IPO/FPO News

Super Khudi Hydropower Appoints Global IME Capital As IPO Issue Manager

Super Khudi Hydropower Limited has appointed Global IME Capital Limited as the issue and sales manager for the issuance of its IPO shares.


Read More
Awesome Image
22

Sep

  • by IT

News 2

The Upper Khudi Hydropower Project is a run of river type project. It is a high head project with 4.69 m3/s design discharge, 531.86 m gross

Awesome Image
17

Jan

  • by IT

News 3

The Upper Khudi Hydropower Project is a run of river type project. It is a high head project with 4.69 m3/s design discharge, 531.86 m gross