Welcome to our Khudi Hydropower 26 MW
The Upper Khudi Hydropower Project is a snow fed perennial Run of River (ROR) project.
The Upper Khudi Hydropower Project is a run of river type project. It is a high head project with 4.69 m3/s design discharge, 531.86 m gross head and 26 MW installed capacity. It generates 129.19 GWh energy annually. It is located at the upstream of existing Khudi Hydropower Project (4.0 MW) in Marsyangdi Rural Municipality of Lamjung district. The project area lies at about 14 km from Besisahar, the district headquarter of Lamjung, and 188 km from Kathmandu. Geographically the project area lies within 84018’32”E / 84019’26”E to 84020’44”E and 28018’22”N to 28021’19”N/ 28021’50”N. The project is owned by Super Khudi Hydropower Pvt. Ltd.
The Upper Khudi Hydropower Project is a run of river type project.
Location & Boundary of Khudi Hydropower Project 26 MW ?
Development Region: Western; District:Lamjung; Nearest town:Beshisahar; East:84020’44”; West:28021’19” to 28021’50” North:84018’32” to 84019’26” South: 28018’22”
Purpose of Khudi Hydropower Project 26 MW ?
Type of Scheme : Run-of-river;Gross Head : 531.86 m; Net Head @ Full Discharge : 517.45 m; Installed Capacity : 26 MW;Plant Factor : 83.36 %;Net Annual Generation : 139.22 GWh.
Hydrology of Khudi Hydropower Project 26 MW ?
Catchment Area: 72.3 sq km;Average Precipitation: 5,176 mm;100 years Flood Discharge: 182 m3/s;Average Flow: 6.13 m3/s;Design Flow: 6.15 m3/s;Minimum Dry Season Flow: 2.092 m3/s.
Settling Basin of Khudi Hydropower Project 26 MW?
Type : Underground;No of Units: 2; Size: 84 m x 4.25 m;Normal Flow Depth: 5.38 m ;Inlet Transition Length : 17 m;Outlet Transition Length: 10.20 m; Settling Criteria: 90% of >0.15 mm at 15oc.
Jan
Super Khudi Hydropower Limited has appointed Global IME Capital Limited as the issue and sales manager for the issuance of its IPO shares.
Sep
The Upper Khudi Hydropower Project is a run of river type project. It is a high head project with 4.69 m3/s design discharge, 531.86 m gross
Jan
The Upper Khudi Hydropower Project is a run of river type project. It is a high head project with 4.69 m3/s design discharge, 531.86 m gross