Khudi Hydropower Project 26 MW

The Upper Khudi Hydropower Project is a run of river type project. It is a high head project with 4.69 m3/s design discharge, 531.86 m gross head and 26 MW installed capacity. It generates 129.19 GWh energy annually. It is located at the upstream of existing Khudi Hydropower Project (4.0 MW) in Marsyangdi Rural Municipality of Lamjung district.

The project area lies at about 14 km from Besisahar, the district headquarter of Lamjung, and 188 km from Kathmandu. Geographically the project area lies within 84018’32”E / 84019’26”E to 84020’44”E and 28018’22”N to 28021’19”N/ 28021’50”N. The project is owned by Super Khudi Hydropower Pvt. Ltd.

Electricity Generation License:
2075 - 02 - 09

Project:
Upper Khudi Hydropower Project 26 MW

Engineer/Consultant:
Hydro Solution Pvt. Ltd

Location:
Marsyangdi Rural Municipality of Lamjung District

We Make Your Dream Carefully.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore.